2023 WINNER – AIR7000 Phase 2B Package 1 (Aircraft Hangar)

Sitzler

The AIR7000 Phase 2B Package 1 (Aircraft Hangar) project (AIR7000 Hangar), marks the establishment of a Maritime Intelligence, Surveillance, Reconnaissance and Response (MISRR) capability to replace the current Maritime Patrol & Response (MPR) capability. Sitzler was the head contractor for the construction of the new and upgraded facilities, infrastructure and airfield works for the introduction of the Boeing P-8A Poseidon at RAAF Base Darwin.